Get a quote
02 · Design and approvals

DA and CDC approvals

Approval is where most residential projects lose their first six months. The way to shorten it is to design for the pathway from the start, rather than drawing the house you want and then finding out which consent it needs.

Stone wall and concrete stair rising to the entry deck, Mosman
  • Featured in Home Beautiful
  • NSW builder’s licence 313669C
  • 5.0 on Google, 9 reviews
  • Northern Beaches, North Shore & South Coast
What it covers

Included in this service

01

Pathway advice

Whether your project can go the CDC route or needs a DA, worked out before the design is locked, not after.

02

DA plans

Development application drawings and the supporting documentation councils on the Northern Beaches and North Shore expect to see.

03

CDC approvals

Complying development where the site and the proposal allow it, which is the faster and more certain path.

04

Council liaison

We deal with the requests for information so you are not translating planner language on your lunch break.

05

Planning strategy

Reading the controls for what they permit, not only what they prohibit.

Covered outdoor kitchen and dining terrace beside the pool, Concord
Why it matters

The difference one team makes.

We are the ones who will build it, so we do not draw something for approval that becomes a problem on site.

You get a complete itemised price before the job starts, a flexible pricing structure, one site supervisor who is on your job, a published programme with weekly reporting, and a defects walk with a twelve month check after you move in.

How we work, stage by stage
Proof

We have done this.

The front of 27 Forsyth Street after the top storey addition

Willoughby: Top storey addition, Forsyth Street

Top storey addition · 2026

Bought as an investment. We walked the property with the client during the inspection stage, before they had committed to buying, and worked out that the highest return would come from adding a top storey. The plans and approvals went through as a council CDC and were finished inside the three months before settlement, so construction could start immediately rather than waiting on a consent.

See the project
“His communication was top notch through the entire process.”
Trent Nicholson · Google review · Narrabeen

Thinking about a project?

We will come and look, and tell you what it will really cost.

Call now Get a quote